03x05 - Pipelines

Episode transcripts for the TV show, "How America Works". Aired: September 20, 2021.*
Watch/Buy Amazon



Showcasing the many individuals who work around the clock to keep America's infrastructure in working order.

03x05 - Pipelines

Post by bunniefuu »

- With a possible exception

of some very big ideas

and a few core beliefs,

nothing keeps Americans

connected to each

other like pipes.

We simply wouldn't have

a country without them,

or a means to transport

the essential stuff of life

from point A to point B.

I refer in no particular order

to oil, water, natural gas,

raw sewage, and of course, beer.

Let's talk about oil.

Every single day, 62

million barrels of petroleum

flows through a vast series

of interconnected pipes.

Without pipes and pipelines,

there is no energy,

there's no energy policy,

there's no electric grid,

there's no indoor pluming.

Copper, steel, brass,

iron, concrete, aluminum,

plastic, PVC, whatever;

pipes are our nation's

circulatory system.

And tonight, we're gonna

meet a few of the people

who build them, skilled

workers whose job

is to keep us all

connected and to show us

"How America Works."

Since their early

introduction in the mid-1800s,

pipelines have played a

critical role in connecting

every corner of

these United States.

And believe me, we have laid

some serious pipes since then.

So much, in fact, that the

United States is now home

to the largest pipeline

network in the world,

which channels everyday

essentials beneath our feet

and throughout our lives.

They're the reason

for running water,

the interstates for oil and

gas, and the great movers of,

well, our movements.

But keeping up with the

needs of a growing nation

requires near

constant expansion,

and never more so

than right now.

Thanks to new construction

and growing developments

across the country,

America will need to bury

another 20,000 miles of

pipeline this year alone.

And it's on companies

like Kinder Morgan,

along with contractors like

LouTex to make that happen.

Here in western Alabama,

nearly 100 of their personnel

are working day-in and

day-out to haul, weld,

and bury a further

three miles of pipe.

Pipe that will bring

natural gas to some 20,000

new homes and businesses.

But with those now

nearing completion,

workers here have

just under a week

to get this pipeline in place.

And to stay on schedule, they'll

need to bury no less than

1,000 feet of it

each and every day.

It's the kind of pace that

would make most pipeliners

drop their shovels and

walk off into the hills.

But not guys like Stringing

Crew Foreman Jerred Harvey

whose sole responsibility

is to make sure

there's plenty of

pipe to work with.

- Let's lay it.

This stringing crew

brings in all the pipe

and sets it down and gets

it ready for the bending

and the pipe crane

to come through.

It's a never ending

battle every day.

- He's not kidding, you know.

Don't worry, you'll see.

But if Jerred and his fellow

pipeliners do everything

just right, here's how the

overall process should go.

First, bulldozers are sent in

to clear a path for the pipe.

Then, guys like Jerred

will truck in and offload

a string of pipe

sections, three at a time.

After that, bending crews

will pass through to,

you guessed it, bend any of

the pipes that need to fit

the lay of the landscape.

From there, welders will join

the sections before the pipe

can finally be lowered

into a ditch and buried.

And that is how our

pipelines go to ground.

But first thing's first

- [Jerred] All right, we

got another truck coming in.

We're gonna throw

skids under the pipe,

set it on the ground.

- [Mike] For that, Jerred

will use a piece of machinery

custom tailored for moving

large sections of pipe,

one that relies

mainly on suction.

- This is a Vacuworx vacuum.

It pulls a suction on it,

holds it with about 30 pounds

of vacuum and that piece of

pipe weighs around 16,000 pounds

and I've picked up a

lot heavier with 'em.

Line me up end-to-end

down there.

Skids down.

- [Mike] Once the last of

these pipes are in place,

Jerred's team will move to

their next location of the day.

But as one of his colleagues

is about to point out,

they may first have to

handle some traffic control.

- (beeps) No.

Ugh, it's just a

little tight right here

and we gotta try to

get this truck out.

Sometimes it's hard to back

up steerable axle trailers.

- [Mike] Complicating

matters more is the fact

that this tight squeeze is

bordered by active pipelines

that are already underground,

and if run over

could take on damage.

- We've got three other

gas lines running over here

and that truck's

about 30,000 pounds

and they don't want

'em driving on it.

You think you can get

turned around up here

in that wide spot?

- Without getting on

these lines over here?

Okay.

Go ahead and open them gaps.

(truck engine rumbling)

All the way out.

Oh, yeah, he got it.

Looks good.

All right, that's all

we gonna put in here.

Let's go over to the pond dam

and grab your daddy's truck.

- [Mike] While Jerred and

his men make their way

to the next location,

further back down the line,

crews are already hard at

work welding, hoisting,

and lowering pipe

into the ground.

But before any of

that can happen,

some of these 80-foot

sections will need to be bent,

and that is where Bending Crew

Boss Ramon Espinoza comes in.

- The bending crew is

one of the first ones

that get out there in the field.

In this crew, I have, I

think about six people.

My job is to relay

the job tasks to them

and make sure they do it right.

- [Mike] It's a tedious

process with little margin

for error, but the

concept is simple enough.

Basically, Ramon and his men

need to ensure that these pipes

match the slopes of the

surrounding terrain.

And as Ramon has come to learn,

there's no shortage of those.

- You can see the ground,

how it dips down

a little bit here.

That would be a sag,

trying to work its way up.

And then you'll obviously

pair it up with an over bend.

Over bend means you're over

bending over a obstacle,

and sag, you're sagging it down.

- [Mike] For the moment,

Ramon will need to give

his latest pipe a

three degree sag,

but first, they'll have to

take a few measurements.

(spray paint can hissing)

- It's really important

to have the measurements

exactly how they are

because any foot less,

it could get us off of balance.

This will be your end

of the joint pipe,

which is right there.

And that flag right there,

that will be your bend.

So, you just bring

it to the pipe.

- [Mike] And with that, it's

time for this pipe to get bent.

A process that requires a

side boom for transport,

a bending machine for,

take a wild guess,

and as always,

Ramon for guidance.

- Six.

Those marks, they are

to show the bender

that he has six pulls of half

degrees to make his degrees.

So that's the reason

why we put six lines

so he can know in two

lines he'll have a degree.

- [Mike] And with those

six lines, now bent,

this pipe should have

the three degree angle

Ramon and the boys

were looking for.

But there's only

one way to be sure.

- As you see right now,

what he has in his

hand is a protractor.

He's gonna check the degrees out

to make sure he has three sag.

Good job.

Well, he has the three sag.

See that sag right here?

Starts right here.

You can almost see

it from far away.

- [Mike] Once these sections

of pipe are put back in place,

they'll wait for the next

crew to align them together

via side boom.

Then, they'll finally

be ready for this guy,

Master Welder Dylan Thomas,

whose goal today will be

joining some three sections

before quitting time.

All with the help

of his partner Lee,

and more importantly, his

custom built welding truck.

- [Dylan] It is 100% mine,

so all my time and money

goes into that rig, making

sure it's up-to-date,

making sure all the

maintenance is good

so it keeps me on the job.

- [Mike] As for this job

- [Dylan] You got

your temp stick?

- [Mike] The guys will preheat

the pipe to 200 degrees,

which should prevent

any unwanted cracking.

Then, they'll team up

with some fellow welders

to knock this joint

out in tandem.

- This pipe is so big,

you need a partner.

And also if you

weld on this side,

you're putting too much

heat stress on this side

and this side's still cold.

You could crack that side out.

- [Welder] Y'all ready?

- [Dylan] You ready, Mr. Mike?

- [Welder] Yup, go ahead.

(sparks crackling)

- [Mike] An experienced

operator like Dylan can create

about 16 feet of weld per day,

but since this pipe will

be moving natural gas,

every inch of these welds

must be absolutely airtight.

- Now that we got it

all the way capped out,

we're gonna look at it

real good and make sure

there's no visible holes

or anything with the weld,

and then we're done with it.

We'll go to the next one

and do it all over again.

- [Mike] But not just yet,

because upon close inspection

it seems there's still

a little patchwork

to be done here.

- [Dylan] And we do

have one little pinhole,

so I'm about to go

ahead and grind it out

and just fix it real quick.

(grinder whirring)

Come on, Lee, buff it.

- You done broke my (beep)?

(light dramatic music)

(light music)

- [Mike] It's hard to comprehend

just how much pipeline

it takes to bring everyday

essentials into American homes.

So here's just how

much pipeline it takes:

more than five million miles.

It's enough to wrap

around the sun, twice.

And with new developments

popping up across the country,

that number is

steadily on the rise.

Take, for example, the

new pipeline Kinder

Morgan and LouTex

are installing in

western Alabama,

one that's due for

completion within the week.

To make that deadline,

they'll need to lay a whopping

1,000 feet of pipe per day.

And already-

- [Dylan] You done

broke my (beep)?

- [Mike] A dead grinder

is threatening to put

the whole operation

behind schedule,

but that doesn't mean

welder Dylan Thomas here

is going gentle into

that good night.

- So since the grinder's

not working off the box

but it's working good

off the weld machine,

it narrows it down

to three issues.

It could be in this plug,

this plug, or inside this box.

I'm gonna take this plug apart

and if this plug's bad in there,

there'll be a big old

burnt spot in there.

And if it's bad, I'm gonna

have to leave the job

and go buy another plug.

- [Mike] Fortunately for Dylan,

it may not have to come

to that; not yet, anyway.

- See I'm looking for

these wires right here

and there shows no

burnt spots in there.

Everything looks good.

So, all that looks good.

So that's not the problem.

The next thing I wanna

check is actually inside

this rear step box.

A wire could have came loose.

Okay, so here's the

problem right here.

This wire has come loose

into this plug right here.

So we'll just put that wire

back in and tighten it back up

and hopefully that

should be the problem.

Plug it in, we'll

see if it works.

(grinder whirring)

We're good to go.

- [Mike] With the

grinder back in business,

Dylan and Lee can finally

clean up the joint,

patch a small

pinhole and wave in

Kinder Morgan's welding

inspector for what they hope

will be a quick sign-off.

But as Dylan knows all too well,

inspectors like Mark

here are as thorough

as they are unforgiving.

- For any pipeline job,

it's kind of like baseball,

three strikes and you're out.

So they try to give you

a little bit of lenience,

but if you make three strikes

in a one job, you're runoff.

- What I'm looking for

is to see if there's

any kind of physical defects,

either undercut or a

pinhole on the outside.

Yeah, Dylan, everything

looks good to go.

- [Dylan] Yes, sir.

- We'll see you at the next one.

- [Dylan] Yes, sir.

- Good luck, buddy.

- Yes, sir.

- [Mike] While Dylan

heads for his next job,

further up the line, another

team is leading the charge

for the whole operation.

After all, you can't

bring in trucks, pipes,

or really anything without

first clearing a path.

Also known as a right of way.

And since it's all

hands on deck today,

the man heading that up will be

LouTex's Co-Owner Mike Harvey.

- [Mike] As a third

generation pipeliner,

Mike knows his way around the

bulldozer better than most,

which makes him the ideal

choice for clearing this section

of right of way

by mid-afternoon.

- [Mike] Well it's

not all repetition

because from time-to-time,

Mike does come up against

the odd roadblock.

And by the look of it,

he may well have spotted

his first one of the day.

- Hm, well that's as far

as I can go right there.

We got a wetland right there

we aren't able to cross.

If y'all can see that

stake right there,

it's got that blue

and white ribbon.

That's a boundary

for our wetland.

Means we can't go

past it right now.

- [Mike] But as Mike

knows from experience,

there's almost

always a workaround.

And after a little scouting,

he just might have found one.

- Like they've got a

wetland drain here.

It's got a little bit of

drain water running to it,

so we're gonna have to be

able a bridge across it.

- [Mike] While Mike heads off

for some bridge

building materials,

just down the line, Stringing

Crew Foreman Jerred Harvey,

that's Mike's son, by the way,

is already starting to

catch up to his old man.

- We've moved to a new location

and we've got about 2,500

foot of pipe we've gotta bring

and put down in here.

Hopefully we can

get across this dam,

and get everything put down.

- [Mike] But before Jerred

and his team can get started,

word from on high brings some

unexpected complications.

- I just got a call

from the inspection team

and the safety team, says,

we can't go across that dam

with those loaded

pipe trucks today.

- What the hell?

- [Mike] Yep, it was thought

that using this existing

two track would be no problem,

but apparently the

crew safety inspectors

don't see it that way.

- We have to understand that

it's more about the control

of the load than

it is the weight.

The pond dam should

hold up fine either way,

but who's to say one

80-foot stringing trailer

might not slip off this dam?

We have no way to control it.

- [Jerred] Yeah.

- So, sorry to be the

bearer of bad news.

That's kind of

what it looks like.

- [Jerred] Mm.

- [Mike] It's far from ideal,

but Jerred does have

permission to use

the more stable track

hoe on the road.

Even so, that's gonna

slow his whole operation

down to a crawl.

- [Jerred] We gotta

unload 'em here

and then track every

single joint across.

It's a half a mile in and

a half a mile out tracking.

So, it takes a little while.

- [Mike] So much for

catching up to dad.

Now, Jerred's main

concern is ensuring

that no one catches up to him.

- We've got probably 50,

60 people running behind us

that's doing the bending,

engineering, pipe gain, ditch.

So if I get behind, then

everybody falls behind.

So the whole thing

is just (beep).

Every bit of it.

- [Mike] Between

oil and natural gas,

pipelines pump a lot of energy

into our everyday lives.

Almost all of it, really,

but they save a good

bit of energy too.

Seriously, to match the daily

output of just one pipeline,

just one, you'd need more

than 700 tanker trucks

running 'round the clock.

For all our pipelines,

make that 90,000 trucks.

That's the kind of flow

that America relies on

to function as it should.

But with housing booms

and other developments

springing up across the country,

the need for new pipeline

is at an all-time high.

Take, for example, the one

Kinder Morgan and LouTex

are building in western Alabama.

One that when finished

will supply some 20,000

homes and businesses

with natural gas.

And with just under a week

to complete the project,

they'll have to bury a full

1,000 feet of pipeline per day.

Unfortunately for him-

- [Jerred] I need all these

vehicles outta the way.

I gotta get this

truck outta here.

- [Mike] Stringing Crew

Foreman Jerred Harvey

has hit a bottleneck that could

ripple delays down the line.

- Inspection's worried that

the steerable axle trailers

could run off of the pond

dam and the trucks turn over

and end up in the pond.

So we were having to tote

every single joint in

to the kick off and

string 'em out one by one

instead of being able to

unload off the trucks.

It slows it down a lot.

- [Mike] At this pace,

Jerred already knows that he

and his team will be working

well into the evening.

But apparently-

- What the hell's wrong

with this piece of junk now?

- [Mike] The hits

just keep on coming.

- [Jerred] Trying to figure

out why this thing won't crank.

It won't pull a suction.

Ain't nothing working right.

- [Mike] It could take hours

to diagnose a faulty vacuum

like this one; time

Jerred doesn't have.

So, he'll have to resort

to the lesser of two evils.

- I guess I'm gonna call

and get a new one on the way

and swap it out.

I'm already behind and

we gotta get stuff done.

I'll just get another one here.

- [Mike] While Jerred heads

for the nearest phone,

not far down the pipeline,

Bending Crew Boss Ramon

Espinoza and his men

are already starting

to close in.

And with the latest of

their jobs now complete,

it's once again time

to make some moves.

- What we are gonna do is

pretty much just hook up

to that side boom right there,

hook the bending machine

up to the side boom

and go on to the next location.

- [Mike] But as Ramon

knows from experience,

you can't just plunk a

rig like theirs anywhere

and get to bending.

No, first, he and his man

will have to make sure

it's perfectly level.

- As far as bending the

pipe if it's not leveled,

your degrees on that pipe are

gonna be different because

that machine'll be leaning

off to one side or the other.

- [Mike] To keep

that from happening,

Ramon's team uses wooden skids,

which should be big enough to

balance the bending machine.

- That machine is heavy.

So, we might put two skids

because they'll end up sinking,

just to have that support on it.

If it's leaning off to the

right hand side, left hand side,

I won't know until I

put this level on it.

We should be good.

- [Mike] With everything set up,

Ramon can finally put

eyes on the next section

in need of some bending,

but by the look

of the landscape,

this one's gonna be a doozy.

- This is a pretty steep creek,

so we're expecting

a big bend here.

It's gonna take us quite

a while just for the fact

that it's real steep

and it's a bigger bend

than just a normal

one or two degrees.

- [Mike] While Ramon

and his men brace

for some serious bending,

back up at the leading

end of the project,

LouTex's Co-Owner Mike Harvey

has a creek of his own to cross,

but since the idea here is to

pave the way for semi-trucks

and other heavy haulers,

he's swapped his dozer

for a 60-ton excavator.

And is now going about the

business of building a bridge.

- [Mike] It's not the most

complicated of designs,

but these wooden mats will

save Mike precious resources

that a full-on

reroute would cost.

- [Mike] And at this point,

Mike's not moving around

much of anything,

including some vegetation

in need of clearing.

(chainsaw whirring)

- [Mike] And with the offending

stumps cut outta the way,

Mike can finally lay

the last of his mats.

- [Mike] But the work

does not stop there.

(phone ringing)

- [Mike] Hello?

- [Coworker] Hey, Mike.

We're gonna need somebody to

go up to the lay down yard

and do some topsoiling.

When do y'all think

y'all can get there?

- Give me about five minutes

and I'll be through with this.

- [Coworker] Okay, sounds good.

Thanks now.

- All right, thanks.

- [Mike] For most of us,

pipelines are simply a means of

moving any number of

commodities from place to place.

But for the three million or

so Americans who build them,

they're also a way

of making ends meet.

And these days, what, with

all the new developments

breaking ground, there are a

lot of opportunities out there.

That's because just

one pipeline project

can create more

than 40,000 jobs,

paying a collective $2

billion to its employees.

But as the good people

of Kinder Morgan

and LouTex can attest, it's

not exactly easy money.

Here in western Alabama,

they're racing like mad

to get another 1,000 feet

of pipeline in the

ground by days end.

But to pull that off,

Co-Owner Mike Harvey here

still has some dozing to do,

not to clear new

right of way so much,

but rather to smooth

out this existing patch.

- [Mike] Equally

important for the trucks

that pass through here, is

avoiding tire punctures.

Something that this

left over tree stump

could cause in a flash.

So, while he's here, Mike

will smooth that out too.

- [Mike] And with

that outta the way,

all that's left are a

few finishing touches.

- [Mike] While Mike puts

his bulldozer to bed,

not far away,

another heavy machine

is just getting warmed up

because to move all this pipe

around the job site,

LouTex relies on a fleet

of three side-loaders.

And few men can run

one of those better

than operator Andy James.

- Our biggest role

is handling the pipe.

Just the up and

down, the in and out.

With a side boom, you

can only do one thing,

and that's pick up and let down.

- [Mike] That may not

sound all that exciting,

but picking up and

putting down pipe

is a huge part of

the process here.

Like when crewmen need

to join sections of it

for the welders to come,

that's when guys like Andy

lend some much needed support.

- Each man on either side

has got a spacing tool

to get the spacing just

right for the welders.

I just kind of hang

out and wait and watch

if they need me to

pick up or down.

- [Mike] In this case it

appears that won't be necessary.

And with this

section now secured-

- [Andy] Here we go.

- [Mike] It's time to

move on to the next.

- [Andy] I just ease back slow,

trying to line myself

up the best I can.

They'll give me some

hand signals as I go

of what I need to do now.

Slow and easy.

- [Mike] And as crewman on

the ground guide this pipe

into position, it's

once again time for Andy

to go on aggressive standby.

- Now that it's in the clamps,

just like the last one,

they'll preheat it,

and they'll use their spacing

wedges to get the right gap

for the welders

coming behind them.

Once they get enough weld in

it, well we can let it down.

I'll go get another one.

The process will repeat.

- [Mike] Meanwhile,

further up ahead,

things have gotten a

little less routine

for Bending Crew

Boss Ramon Espinoza,

who will typically bend sections

between two and three degrees.

But with a steep creek crossing

in this pipeline's path,

they're gonna have

to up that angle

to a slightly more

complicated 17 degrees.

- [Ramon] This is one of our

biggest bends, like I said,

we have pipe g*ng

right behind our back.

So it's really important

to get this done

so we can keep them working.

(engine rumbling)

- [Mike] But to bend

pipe, you need pressure,

and for some reason Ramon

doesn't seem to be getting any.

(light dramatic music)

- It's not building any air.

All the valves are open.

I'm gonna go on

to the other side,

check it out up top to

see if something's wrong.

There it is.

So if you hear it,

it's building up air.

- [Mike] Even so, it's

still not as much air

as Ramon will need.

- No?

It's not supposed to be

acting like that though.

(light dramatic music)

- [Mike] It's hard to say just

where our country would be

without its various pipelines.

But one could argue that

there might not be a country

at all, not ours anyway.

That's because in the

height of World w*r II,

Allied forces look to the US

for a full 85% of their fuel.

And at the time the only

means of moving raw petroleum

to refineries in the

northeast was via tanker ship.

Well it didn't take long

for n*zi strategists

to figure that out.

And by 1942, a barrage

of U-boat attacks

had cut our supply

line by more than half,

not nearly enough to

support the w*r effort.

And so, the United

States started digging

and created a pipeline

running all the way from Texas

to New York City.

And by 1943, the Allies

were finally back on track.

Fast forward 80 years and

the pipelines crisscrossing

our nation are still

every bit as impactful

as they were then.

But getting them

into the ground,

that hasn't gotten much easier.

Just ask Bending Crew

Boss Ramon Espinoza,

who to run this section of

natural gas pipe across a creek,

will first need to

bend it by 17 degrees.

Unfortunately, for

he and his team-

- [Mike] An issue

somewhere in the works

is robbing them of the air

pressure they need to do it.

- But it has enough air to go.

So that's why you can

hear it open up and close,

but now it doesn't

(air hissing)

See how it just

opens up and closes?

It has enough pressure.

- [Mike] But as Ramon's

esteemed colleague

is quick to demonstrate,

the problem might just

be a kink in the hose.

(air hissing)

- Got it to work.

(soft rock music)

- [Mike] And with that, it's

time to get back to bending.

But when creating an

angle of this degree,

Ramon must also keep

his head on a swivel.

- Where it gets dangerous there

is simply the fact that you're

making a 17 degree bend.

You keep on pushing

it back as you bend it

and it just keeps on

going up to the air.

It could slip off the

belt and actually,

you know if there's anybody

beside it, it will crush him.

- [Mike] Lucky for Ramon,

this side boom seems to be

holding on just fine.

And with the last

of the bends made,

all that's left now is to

take some final measurements.

- He's trying to figure out

if he has 17 degree bend.

So, you got it?

Chad?

- [Mike] Guess we'll

take that as a yes.

Anyway, about a mile back,

Side Boom Operator Andy James

has turned his focus from

lining up pipe for welding,

to putting it into the ground.

- Got a call that ditch

crew was about ready

to start lowering in.

So we broke our side boom down

and had to do a haul around,

reassembled it.

Now, we're here,

ready to lower in.

- [Mike] Well, almost ready.

First, Andy will need to

give his lowering equipment

a quick once over.

- We got our cradle hooked up.

You gotta make sure that

your wheels are clean,

make sure they're rolling.

Check your cables, make

sure there's not any burrs

or make sure all your

bolts are in place.

Everything looks good.

- [Mike] In all, the job of

lowering this stretch of pipe

will be up to four

heavy machines.

And doing it right will take

some close coordination.

- What'll happen is actually

this track hoe right here,

he'll pick up the end and we'll

set everybody in sequences.

Next track hoe, and

he'll roll 'em on.

Second tractor in

line'll roll 'em on.

The pipe just slides through

and it stays continuous

and once we get to the other

end we just roll 'em all.

- [Mike] It sounds

straightforward enough

but there's a lot of

nuance to a job like this.

Like making sure the

full weight of the pipe

is evenly distributed

across all four rigs.

And judging by Andy's demeanor-

- We ain't trying to win a race.

- [Mike] That's not happening

as well as it could.

- We already know Tyrell

is gonna finish first.

- [Mike] Put enough weight

on it and Andy knows

his side boom could topple

straight into this ditch.

So when the choreography

doesn't improve,

neither does Andy's mood.

- (whistles) Yo!

Hey!

Ain't nothing changed.

We can't get no further.

We can't get no closer.

Everybody gotta stay

the same distance.

Y'all about to put this

whole (beep) in the ditch.

Where's Stanley at?

This is apparently more they

can (beep) handle down here.

- [Mike] Guess we'll

check back later.

In the meantime, things seem

to be going a little smoother

for welder Dylan Thomas

and his partner Lee,

who having just completed

their final joint of the day,

just need Kinder Morgan's

resident inspector

to give 'em the sign off.

- All right, Lee, get it ready

to roll up and everything.

See if the inspector likes it.

We'll call it a day.

- [Dylan] I hope so.

If you like it, I ain't

gotta weld on it no more.

(light dramatic music)

- Looks all right.

- All righty.

- [Mike] Unfortunately

for Dylan,

Inspector Mark has spotted

another weld further back

that does not look so good.

- About eight welds back.

- Okay.

- X-ray found some slag

about three o'clock.

- [Dylan] Yes, sir.

- Sorry you can't go home yet.

- [Dylan] Roll it up, Lee.

- [Mike] Even though

the weld wasn't Dylan's,

as the only welder left on site,

he'll have to get it squared

away before clocking out.

After all, he knows as

well as anyone that a leak

in the pipeline

can spell disaster.

- A defect in the weld could

result in when we hydro it up

and pressure it up, it

could blow the weld out,

it could just hurt the

integrity of the pipe,

throughout a couple of years,

it may start

leaking natural gas.

And we don't need anything

like that happening.

So we're gonna grind into it,

clean it all out and put

some clean weld in it.

(light dramatic music)

- [Mike] Well it's been a

long one for the pipeliners

of Kinder Morgan and LouTex,

who in western Alabama have

been struggling to complete

another 1,000 feet of

natural gas line by days end.

Thanks to their

collective efforts,

that goal is slowly

becoming a reality.

But before Dylan Thomas

and his partner Lee

can call it quits,

they'll first need to

clean up a faulty weld

left by one of their colleagues;

lest at rupture, leak or

otherwise cause problems.

First, though, they'll

need to find the fault.

- So they're saying

it's inside the fillers,

so that's gonna be

pretty deep in there.

But instead of taking a

grinder straight to it,

I personally like to

sand that cap down flat,

that way that grinder

don't start jumping.

So let's smooth this up.

- [Mike] A jumpy grinder

has a way of creating dings,

nicks and gashes that Dylan

would also have to fix.

But a smooth surface

should make the grinding

more manageable.

- Now that I got that

sanded down flat,

we're gonna take a grinder

and start grinding into it

and see if we can't find

anything inside this weld.

(grinder whirring)

There was a two inch

slag line right there

on this edge right here.

We grinded it all the way out.

Now we're gonna put

some new weld in it.

- [Mike] And since this

weld will be Dylan's,

he'll also need to sign his

work when he's finished.

- And we should be good to go.

Well, that's all for me today.

We capped a bunch of pipe.

Got a lot done today.

Now it's time for me Lee

to go drink some cold beer

at the camper.

(soft rock music)

- [Mike] Dylan may be headed

out for the afternoon,

but further back

on the pipeline,

Stringing Crew

Foreman Jerred Harvey

has a long way to go yet.

(hammer tapping)

- (beep) Love this (beep).

All day, I just wanna struggle

all day on everything.

- [Mike] In all fairness,

it has been a bit of a day,

which started when Jerred was

told he could only move pipes

across this dam via track hoe,

a major delay all its own.

But now, he can't even do that.

- We had some sort of

a mechanical failure.

Our vacuum won't spin now.

We gotta hurry up

and get this fixed

'cause I got six more

trucks I gotta get unloaded.

Now we are at least two

or three hours behind.

- [Mike] But with a new

vacuum now on the scene,

Jerred's fortunes may

finally be taking a turn

for the better.

- Come on with it, baby.

(hammer tapping)

All right.

All right, we got the the

pivot pin swapped over now.

So we're fixing the

hook these lines up

and get it outta this tray.

- [Mike] And with

that, all that remains

are a few finishing touches.

- (sighs) We're gonna

put this shoe back on

and get this truck outta here.

We can start getting

pipe unloaded again.

Where's your hammer?

Where's your hammer?

Hit that some for me, will ya?

Just start it, hit it.

Send her home.

(hammer tapping)

(truck engine rumbling)

Ah, here he comes, y'all.

The truck's coming.

Go ahead.

- [Mike] While Jerred and his

crew return to placing pipe,

further back on the line,

tensions are running even higher

for Side Boom Operator Andy

James and his colleagues,

whose final job today is

to get this section of pipe

lowered into a ditch.

- (whistles) Yo!

Hey!

- [Mike] But despite

his best efforts-

- Everybody gotta stay

the same distance.

- [Mike] They haven't gotten

off to the greatest of starts.

- Y'all about to put this

whole (beep) in the ditch.

Where's Stanley at?

- [Mike] It was right

about here that we decided

Andy might appreciate a

little time to himself.

After all, when you're

moving a length of pipe

worth half a million dollars,

making a TV show is far

from the top priority.

- [Mike] But after

a quick consultation

with the aforementioned Stanley,

it appears that everyone is

finally on the same page,

and our friend Andy

is back in the saddle.

- [Andy] You got it, hit it.

We kind of had a little

miscommunication,

maybe our equipment got

spread out a little too far.

Basically what that means is

each one's trying to carry

more weight than it can.

So, we kind of had to

back up and readjust,

and start a new plan.

- [Mike] With everyone

now working in unison,

that new plan comes

together in no time,

and another section of

pipeline is ready to be buried.

- We got it dialed in to

where everybody needed to be.

I'd say it went real

smooth, you know?

Now that we got it dialed in,

we're ready to go

for the next one.

- And with that, Andy

and his fellow coworkers

power on into the evening,

stopping at nothing to

complete today's goal

of 1,000 new feet of line.

And though once finished,

the fruits of their labor

will stay out of sight

and largely out of mind,

the services that

these pipelines provide

will be no less essential to

making life as we know it,

well, life as we know it.

So the next time you run

a faucet or light a stove

or fill up your car

or flush a toilet,

take a moment to

appreciate the pipeliners

who made all that possible

because they are among the most

essential undercurrents

of "How America Works."

A couple of years ago, somebody

gave me this piece of pipe,

and I'm very fond of it,

in part because it has

my picture on the side.

It also has a quote

attributed to me.

It says, "Not all knowledge

comes from college."

I stand by that quote

because it's true.

It's also true that over

three million Americans

are making a pretty good living

in the pipeline

industry right now.

Many of whom did not

attend a four year school.

They simply got the training

they needed to get to work.

There are tens of thousands

of open positions today

in the pipeline industry,

many of which provide

a straight path

to a six figure career.

If you think I'm going

to suggest you explore

those opportunities,

you are correct.

You'll find them at

mikeroweworks.org/haw.

Not pipe dreams,

real opportunities to

make a great living.

Check 'em out.